Hotline  027-81314188

Solution
Your location:Home > Engineering case > Solution


Equipment required for the installation (repair, test) power facility license (test category 5th level)

AddTime:2021-02-25 17:21:42   Views:317  

 

Obtain a five-level decoration test permit, and can engage in the installation, maintenance or test activities of power facilities with voltage levels below 10kV.

 

Serial number

Machine equipment name

Unit

Quantity

Specification

Model

One

High-voltage generating equipment

1

DC high voltage generator

set

1

DC:60kV/2mA

YNZGF-60/2

2

Power frequency withstand voltage test device

set

1

AC:5kVA/50kV

YNYDJ-5/50

3

Frequency conversion series resonance test complete set

set

1

75kVA/75kV/1A   30~300Hz

YNXZ-75/75

Two

Electrical measuring instrument

1

Loop resistance tester

station

1

DC:≥100A

YNHL-100A

2

Three-phase relay protection tester

station

1

Two groups of three-phase voltage and current

YNJB-802

3

Transformer volt-ampere characteristic tester

station

1

500V/5A

YNFA-II

4

Ground Resistance Tester

station

1

 

YN2571

5

Transformer DC Resistance Tester

station

1

DC:≥10A

YNZZ-10A

6

Transformer ratio tester

station

1

Digital 0.5 level

YNBC-H

7

Circuit breaker characteristic tester

station

1

 

YNGK-6F

Three

Commonly used instruments

1

Megohmmeter

only

1

DC:2500V

YN2671

2

Megohmmeter

only

1

DC:500V

YN2670

3

Digital double clamp phase voltammeter

only

1

Measuring current 1mA~5A

SMG2000B

 

For more information about Yuenenggao products, please click Product Center. Service hotline: 027-81314188, 18627106286.

 

Copyright © Wuhan Yueneng High Test Power Equipment Co.,Ltd. http://www.whyngc.com All Rights Reserved    Website productionSanjin.net    鄂ICP备16014120号-2