The "Administrative Measures for Installation (Repair, Test) Power Facilities Permits" will come into effect on October 11, 2020. The "Administrative Measures for Installation (Repair, Test) Power Facilities License" (State Electricity Regulatory Commission Order No. 28) promulgated by the former State Electricity Regulatory Commission on December 18, 2009 shall be repealed simultaneously. Huatian Power briefly introduces the new version of the guide for the selection of construction machinery and equipment required for the four-level power facility license for undertaking (repair, test) testing.
Obtain the four-level installation (repair, test) license, and can engage in the installation, maintenance or test activities of power facilities with voltage levels below 35 kV.
Tested category Level 4
Serial number | Machine equipment name | Unit | Quantity | Specification | Specification model |
一 | High-voltage generating equipment | ||||
1 | DC high voltage generator | set | 1 | DC:120kV/2mA | YNZGF-120kV/2mA |
2 | Power frequency withstand voltage test device | set | 1 | AC:30kVA/50kV | YNYDJ-30kVA/50kV |
set | 1 | AC:6kVA-10kVA/50kV | YNYDJ-10kVA/50kV | ||
3 | Frequency conversion series resonance test complete set | set | 1 | 75kVA/75kV/1A 30~300Hz |
YNXZ-75kVA/75kV |
4 | Induction withstand voltage test device | set | 1 | 5kVA/360V 150Hz |
YNSBF-5kVA/360V |
Two | Electrical measuring instruments | ||||
1 | High voltage dielectric loss tester | station | 1 | 1. The medium measurement accuracy is 1% 2. The capacitance accuracy is 0.5% 3. Anti-interference frequency conversion |
YNJS-H |
2 | Three-phase relay protection tester | station | 1 | Two groups of three-phase voltage and current | YNJB-1200 |
3 | Loop resistance tester | station | 1 | DC:≥100A | YNHL-100A |
4 | Transformer volt-ampere characteristic tester | station | 1 | 500V/5A | YNFA-II |
5 | Ground Resistance Tester | station | 1 | YN2571 | |
6 | Transformer DC Resistance Tester | station | 1 | DC:≥10A | YNZZ-10A |
7 | Transformer ratio tester | station | 1 | Digital 0.5 level | YNBC-H |
8 | Circuit breaker characteristic tester | station | 1 | YNGKC-6F | |
9 | Insulation Resistance Tester | station | 1 | DC:0~5000V 200G(Ω) Short circuit current ≥3mA |
YN-5000 |
Three | Commonly used instruments | ||||
1 | Megohmmeter | only | 1 | DC:2500V | YN2671 |
2 | Megohmmeter | only | 1 | DC:500V | YN2670 |
3 | Digital double clamp phase voltammeter | only | 1 | Measuring current 1mA~5A | SMG2000B |
Those who have obtained the four-level test-based installation (repair, test) power facility license can engage in testing activities for power facilities with voltage levels below 35kV. Applicants should meet the following conditions:
1. Net assets
Have the net assets that are suitable for carrying out the installation (repair, test) power facilities activities, and their proportion of total assets shall not be less than 15%.
2. Person in charge of technology and person in charge of safety
Those who apply for Level 4 to Level 5 licenses shall have at least 3 years of work experience in installation, maintenance or test management of electric power facilities corresponding to the type of license they are applying for, and have a junior professional title or above in electric power-related majors.
3. Professional technical and skilled personnel
For those who apply for a level 4 to 5 license, there are no less than 10 and 5 electric power-related professional and technical personnel, respectively; no less than 15 and 5 electric power-related professional and technical personnel, including no less than 8 and no less than 8 high-voltage electricians. 3 people.
Our company's products are produced in strict accordance with international standards, national standards, and industry and enterprise standards. They have passed professional inspections by national, provincial and municipal electric power research institutes, measurement centers and electric power authorities, and fully passed the ISO9001 international quality management system certification. GB/T19001-2008 quality management system requirements, GB/T24001-2004 environmental management system requirements, GB/T28001-2011 occupational health and safety management system requirements.
-
Pre-sale commitmentWarmly welcome calls and visits
Provide fast and professional response
Timely, serious and reasonable quotation -
Commitment in saleStrictly execute the contract
Professional technical training